built in 2020-01-01 :: System length: 163.8km
| TRAIN NETWORK-RAILWAY | my Page about MAPS | This hReview brought to you by the hReview Creator. |
||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||
Doha COUNTRY TOWN TRAIN METRO PLAN&MAPS |
The Doha Metro is a planned rapid transit system in Doha, Qatar's capital city, that is scheduled to become operational by the end of 2019.It will have four lines with an approximate overall length of 300 km and 100 stations.[3] It will be an integral component of the larger Qatar Rail network, which will include a long-distance rail for passengers and freight, linking Qatar to the GCC, and Lusail's city local light rail transit (LRT). Capable of reaching 100km/h, Doha Metro will be 1 of the fastest driverless trains in the world Doha Metro will be operated and maintained for a duration of 20 years by RKH Qitarat, a joint venture formed by Hamad Group (51 %) and French transit operators Keolis and RATP Dev (49 %), on behalf of system owner Qatar Rail more on:--Wikipedia | ||||||||||||||||||||
Examples of Lines & Stations | Red Line | Hamad International Airport | Green Line | ||||||||||||||||||
Doha metro | Umm Slal Stadium | Gold Line | Al Rayyan South |
Doha metro![]() |
Doha metro |
Doha metro![]() |
Doha metro![]() |
Doha metro![]() |
Doha metro![]() |
![]() |
Sunday 11th of April 2021 |
| |||||
![]() |
![]() |
![]() |
![]() |
![]() | ||
Webmaster : Frederic PETIT-DIEULOIS fpetit_dieulois@yahoo.fr Sunday 11th of April 2021 by freddy, based on
Frederic
DIEULOIS
PETIT
Freddy
Engineer
|